The barn was completely emptied to spray foam 2 inches of closed cell foam.
Once the permit was issued, PSE hooked up power to the barn.
The metal building came on a semi-trailer that needed to be offloaded with the telehandler.
The barn is up just in time for the holidays!
The barn’s foundation was engineered as a monolithic slab with a thickened edge.