The barn’s foundation was engineered as a monolithic slab with a thickened edge.
Tor checking the plansElectrical stubbed out prior to the pourData and power conduitsPlumbing stubbed outGravel prep for the slab. The weather is hot, so the decision has been made to pour the slab in two sections over 2 daysDay 1 concrete pourDay 2