After patiently waiting a few weeks to allow the concrete slab to cure, we can start the erection of the metal frame.
Moving the columns over to the build sitePicking, identifying and sortingInstalled the first few columns and attached girtsAssembly of wind bentThe first rafter is raised and bolted to the columns